Granada Gold Mine Unveils High-Grade Flow Sheet, Poised to Become Low-Cost Gold Producer on Cadillac Break
(via TheNewswire) Rouyn Noranda, Q.C., March 26, 2024 – TheNewswire – Granada Gold Mine Inc. (TSXV: GGM) (OTC: GBBFF) (Frankfurt: B6D) (the “Company” or “Granada”) is pleased to announce the development of a high-grade flow sheet for the ore at its Granada property. Leveraging this advancement, the company is currently sourcing the main processing equipment designed to operate at 10 grams per tonne (gpt) gold or higher, with a targeted capacity of 550 tonnes per day. The plant is of
Read more